Project Overview.
Trojena Dams, Lakebed Treatment & Bow Project
Trojena is part of NEOM’s regional plan, located 50km from the Gulf of Aqaba coast in the heart of our nature region. Elevations range from 1,500m to 2,600m and cover an area of nearly 60 square kilometers.
Ideally located for alpine and adventure sports, Trojena experiences sub-zero winter temperatures and has a year-round moderate climate that is cooler on average than the rest of the region. With its clear fresh air and panoramic views, Trojena will not only be a mesmerizing place to visit, but also the perfect place to live and work.
The main dam will be made of roller-compacted concrete (RCC) and will be 145 metres high, 475 metres long and holding a volume of approximately 2.7 million m³. The second dam will also be in RCC, while the third will be in rock, with a volume of 4.3 million m³. The artificial lake will cover an area of 1.5 km² and will have an island reserved for botanical dives and walks.
The Lake, which will be the largest architecturally-crafted body of water in Saudi Arabia, is a central feature of Trojena’s LAVA designed masterplan. Sitting at the very heart of the development, it will be key to Trojena’s ambition to sustain and regenerate the area’s vibrant natural environment, offer clean, serene outdoor mountain living, and become a global hub for water sports and entertainment.
Specialized Work Scopes.
Temporary Concrete Work
Project Title: Trojena Dams,Lakebed Treatment & Bow Project
Works Scope: Supply, Delivery & Installation of temporary Concrete Works Including Materials
at Laydown Area In Neom Trojena Dams Project
Client: NEOM – Kingdom of Saudi Arabia
Project Management Consultant: Bechtel
Design Consultant: Bechtel
Main Contractor: Webuild S.P.A Saudi Arabia Branch
Construction Period: on-going
Concrete works for Culvert
Project Title: Trojena Dams, Lakebed Treatment & Bow Project
Works Scope: Execution of concrete works for Culvert at Office and Laydown Area.
Client: NEOM Kingdom of Saudi Arabia
Project Management Consultant: Bechtel
Design Consultant: Bechtel
Main Contractor: Webuild S.P.A Saudi Arabia Branch
Construction Period: on-going
Structure for Warehouse Storage
Project Title: Trojena Dams, Lakebed Treatment & Bow Project
Works Scope: Design, Fabrication, Transportation, Loading & offloading and Erection of steel Structure for Warehouse Storage Shelters (Oxygen/Acetylene Cylinders & Lubricants)
Client: NEOM Kingdom of Saudi Arabia
Project Management Consultant: Bechtel
Design Consultant: Bechtel
Main Contractor: Webuild S.P.A Saudi Arabia Branch
Construction Period: on-going
Civil Works & Sewage System
Project Title: Trojena Dams, Lakebed Treatment & Bow Project
Works Scope: Execution of Civil Works & Sewage Systems for Webuild Office Building 1, 2 & 5, 6 in the Trojena Job site
Client: NEOM Kingdom of Saudi Arabia
Project Management Consultant: Bechtel
Design Consultant: Bechtel
Main Contractor: Webuild S.P.A Saudi Arabia Branch
Construction Period: on-going
LED Solar Flood Light
Project Title: Trojena Dams, Lakebed Treatment & Bow Project
Works Scope: Supply and Installation of LED Solar Flood Lights in Webuild office and site Laydown Area
Client: NEOM Kingdom of Saudi Arabia
Project Management Consultant: Bechtel
Design Consultant: Bechtel
Main Contractor: Webuild S.P.A Saudi Arabia Branch
Construction Period: on-going
Water Distribution Line
Project Title: Trojena Dams, Lakebed Treatment & Bow Project
Works Scope: Execution of Water Distribution Line for Webuild Site Office
Client: NEOM Kingdom of Saudi Arabia
Project Management Consultant: Bechtel
Design Consultant: Bechtel
Main Contractor: Webuild S.P.A Saudi Arabia Branch
Construction Period: on-going