Qiddiya Project
Back to Projects
Infrastructure & Demolition
Qiddiya, Saudi Arabia

Qiddiya Project

Project Overview.

Qiddiya - resort core primary and secondary roads, bridges and utilities.

The Saudi Real Estate Company (Al Akaria) Announces signing Infrastructure Packages Contracts between Qiddiya Investment Company (QIC) to one of its subsidiaries “Saudi Real Estate Infrastructure Company (Binyah)” jointly with Infraroad Contracting Co. LLC.

The Value of the Contract is SAR 2.2 billion.

The Project is to execute the construction, testing and commissioning parts of Main infrastructure networks and bridges for Qiddiya Resort Core, including parts of primary and secondary roads and utilities networks, utility culverts, pedestrian bridges and perimeter cut-off storm drainage channels along with Design, construction, testing and commissioning of sewage treatment plant, irrigation water storage tanks & pump station, potable water storage tank & pump station and solid waste transfer hub.

The duration of the Project is 22 months.

Binyah Company is one of the national companies specialized in implementing infrastructure development works, of which the Saudi Real Estate Company (Al Akaria) owns (60%). It specializes in constructing roads, streets, sidewalks and road supplies, constructing bridges and tunnels, laying oil and gas pipelines, constructing stations and main lines for water distribution, constructing sewage stations and projects, sewage networks and pumps, constructing port docks and marine construction, demolishing and removing buildings and others, Enabling sites from (cutting, filling, Demolition & compaction) and networks extensions.

Specialized Work Scopes.

1
Scope 01

Civil Works

Project Title: Qiddiya Project

Qiddiya resort core primary and secondary roads, bridges and utilities.

Works Scope: Supply & Installation of all civil works like concrete, block works and plastering, finishing work like flooring, walls and ceiling at package-04 south, package-04 north and package 03 area in Qiddiya IB-JV Project.

Client & Engineer: Qiddiya Investment Company

Design & Supervision: Jacobs

Cost Consultant: Aecom

Main Contractor: InfraRoad Binyah L.L.C

Construction Period: on-going

Gallery 0
01
Gallery 1
02
Gallery 2
03
Gallery 3
04
Gallery 4
05
Gallery 5
06
2
Scope 02

Inherited Assets Demolition

Project Title: Qiddiya Project

Qiddiya Inherited Assets Demolition

Works Scope: Demolition of existing inherited assets (DIA)

Main Contractor: ONUR Cont. Trans. Const. Trade and Ind. J.S.Co. K.S.A

Construction Period: on-going